skip to main
|
skip to sidebar
New Building Project: Dormitory and Facility Extension Block
United Christian College (Kowloon East)
向神求大事,為神作大事
顯示包含「Building Layout」
標籤的文章。
顯示所有文章
顯示包含「Building Layout」
標籤的文章。
顯示所有文章
2007年2月28日星期三
Dormitory
This page is under construction.
2007年2月6日星期二
New Building
Canteen
Lecture Theatre (160 seats)
Chapel (200 seats)
Swimming Pool (4 - lane 25m )
較舊的文章
首頁
訂閱:
文章 (Atom)
Fund Raising Campaign Video
Vision & Mission
Why Fundraise?
What makes UCCKE distinctive?
Fundraising Target
Donation Method
Ways to get involved
Ways to contribute
Reply Slip
Activity Highlights
Student Walkathon (27/10/2006)
Ground Breaking Ceremony (20/1/2006)
Parent-Teacher Walkathon (31/3/2007)
Building Layout
New Building
Swimming Pool
Chapel
Dormitory
Lecture Theatre
Canteen
From the Principal
Dr. Dravid C.S. To
From the Chairman
Prof. Michael S.C. Tam
Sharing
Parents
Students
Teachers
Contact Us
Contact Us
Fundraising Committee
About Us